Projects under Execution:

 CORPORATE ISPAT ALLOYS LIMITED: (CIAL)

Configuration & Details

CIAL was incorporated on February 26, 1988 and subsequently became a public limited company under the name of Corporate Ispat Alloys Limited with effect from February 18, 1993. The main object of the company is to carry on the business of manufacturers of iron, steel, alloy steel, mild steel, carbon steel, forging steel and all other types of ferrous and non-ferrous metals and products thereof and as re-rollers, fabricators.

Location

3.45 MTPA Captive Coal Mine, Chitarpur Coal Block Chandwa, Jharkhand

2 x 500 TPD DRI Plant and 40 MW Power Plant Saraikela, Jharkhand

10 MW Bio Mass Power Plant, Durgapur, West Bengal

Project Cost

Rs. 470.00 Crores

Rs. 511.00 Crores

Rs. 52.00 Crores

Commissioning

Scheduled April 2012

Scheduled September 2012

Scheduled October 2011

 

 ABHIJEET INFRASTRUCTURE LIMITED: (AIL)

Configuration & Details

AIL was incorporated on July 19, 1984 as Abhijeet Iron Processors Pvt. Ltd. Its name was changed to Abhijeet Infrastructure Private Limited in the year 2001. On September 30, 2004, AIL was converted to a Public Limited company.

Location

Phase-I – 2 x 500 TPD DRI Plant, 30 MW WHRB Power Plant and 10 MW AFBC Power Plant and 0.69MTPA Captive Coal Mine Development at Saraikela, Jharkhand.

Project Cost

Rs. 846.00 Crores

Commissioning

Scheduled January 2013

 

 ABHIJEET FERROTECH LIMITED: (AFL)

Configuration & Details

Abhijeet Ferrotech Limited (AFL) is setting up an 8X13.5 MVA Ferro alloy plant at Visakhapatnam, Andhra Pradesh. The total capacity would be 119,401 tpa of Ferro manganese and 61,406 tpa of silico manganese. The total project cost of Rs 554 Crores and is being financed by debt equity ratio of 2:1. The AFL has achieved financial closure and the disbursement has started in October 2009.

Location

8X13.5 MVA Ferro Alloy Plant, Visakhapatnam, Andhra Pradesh

Project Cost

Rs. 555.00 Crores

Commissioning

Scheduled December 2011 

 

 KAIZN POWER LIMITED: (KPL)

Configuration & Details

Kaizen Power Limited (KPL) is a Special Purpose Vehicle (SPV) promoted by Abhijeet Group for setting up 300 MW Captive coal based power project at Vishakhapatnam in the state of Andhra Pradesh. 

The total project cost is estimated of Rs 1,644 Crores and is being financed by debt equity ratio of 4:1. The Debt of the project has been In-Principally Underwritten by UCO bank.

Location

300 MW Power Plant, Visakhapatnam, Andhra Pradesh

Project Cost

Rs. 1,644.00 Crores

Commissioning

Scheduled April 2013

 

 JAS INFRASTRUCTURE AND POWER LIMITED:

Configuration & Details

Special Purpose Vehicle (SPV) promoted by Abhijeet Group for setting up pithead coal based power project in the state of Bihar.  JICPL proposes to develop the project in two phases of 1,320 MW each.

The project envisages setting up of 2 units of 660 MW each using super critical technology. The Coal Requirement for phase I of 1320 MW will be mined from alloted captive coal mine from Mahuagarhi Coal Block.

The total project cost is estimated of Rs 7413 Crores and is being financed by debt equity ratio of 4:1. The Debt of the project has been In-Principally Underwritten by Axis bank.

Location

1,320 MW Power Plant, Banka, Bihar

Project Cost

Rs. 7,413.00 Crores

Commissioning

Scheduled July 2014

 

 ABHIJEET HAZARIBAGH TOLL ROAD LIMITED:

Configuration & Details

AHTRL is SPV formed by Abhijeet Group to undertake construction, operation & maintenance of Barhi-Hazaribag Section of National Highway for 40.500 Kms to be Executed on DBFOT Pattern Under NHDP Phase-III. The Project will be undertaken with NHAI Contribution (Grant) of Rs. 150.85 Crores and Promoter Contribution of Rs. 75.43 Crores.

Location

Hazaribagh, Jharkhand.

Project Cost

Rs. 467.28 Crores

Commissioning

Scheduled – December 2012

 

ABHIJEET INTEGRATED STEEL LIMITED:

Configuration & Details

Abhijeet Integrated Steel Ltd. (AISL) was incorporated as Ahimsaa Global Media Limited on January 28, 2004 which was changed to JSL in 2008. JSL is presently engaged in the business of trading of securities. The Company proposes to wind up the securities trading business on completion of the proposed project. AISL proposes to set up a Beneficiation Plant and Pellet Plant of 1.2 MTPA respectively at Saraikela – Kharsawan, Jharkand. 

Location

Beneficiation & Pellet Plant, Saraikela, Jharkhand.

Project Cost

Rs. 575.00 Crores

Commissioning

Scheduled – August 2012

 
     
 
 
   
   
   
 
 
 About Us
Chairman's Message
Vision and Values
Key Managerial Personnel
Board of Directors
Group Companies
Significance
 
 
   
 © 2007Abhijeet Group Home l Feedback| Contact Us | Site Map Site Developed by broadband-india.net